Automation + Auditability = Accelerated Grid Connection via VDE-AR-N 4120/A1
Install the PWA toolbox to your home screen
👇 Tap the Share icon (below) and select "Add to Home Screen"
Fast offline access • No updates needed • Full grid analysis
Validate VDE/BDEW compliance parameters in real-time
BDEW/VDE Compliance Engine
Drop BDEW XML or JSON grid file here
Accepts .xml, .json (Max 10MB)
Data completely purged post-analysis (GDPR Compliant)
Awarded 2nd Place globally in the Future Engineers Program at CWIEME Berlin for outstanding grid simulation architecture.

Award Ceremony
Validating grid compliance directly in the browser—eliminating utility-scale integration friction.

📍 CWIEME Central Grid Stage, Berlin
"Technical innovation meets industry-wide recognition on the world's largest electrical engineering stage."


Simulation solver runs completely offline directly inside your browser
VDE-AR-N 4110 / 4120 compliant analysis and export roadmap
Accelerated connection approvals through structured data pipeline
⏱️ ~2 minutes • No sign-up required • GDPR compliant